Wednesday, May 8, 2013

Week four

We're at the halfway point of week 4. The changes are taking a bit longer to materialize now-a-days but once they do, they're pretty noticeable.
The first planter is built. Below this (on the ground) will be the counter with the sink and prep area for the wood-fired pizza oven. The outdoor shower will be on the wall directly ahead. You can see some of the water lines that will be used to provide water to the sink and the shower.

Brian is sitting on top of the gazebo which is suddenly looking pretty huge.

Here a view from the back lawn which will be inclosed in the new back yard. Clearly we're going to have to do some landscaping when this is all done.

Matt arriving with the Fiberon decking - almost 10,000 lbs of it.

Looking up from the hot tub this is what you'll see. The copula that is sort of the crown of the gazebo is going to have glass sides and a copper roof. It will be a smaller version of the copula that will eventually be on top of the barn.