Sunday, May 19, 2013

End of Week Five

At the end of week 5 things are really starting to shape up. Today Mike and I went out and bought the subway tile and the shower head that will make up the outdoor shower. We're still waiting, patiently, for the arrival of the hot tub.
The decking is all down. The jagged edges still protrude along the edge of the pool. They'll be cut back and then the new liner will be installed.

Clean pool water will be a huge improvement.

Standing next to where the shower is going to be and looking back toward the house gives an idea of the distance.

The seating next to the hot tub area is framed out. The boxes at the bottom of the gazebo pillars will be covered with cedar shakes to tie it in with the rest of the house.